Product revisions

Where: a product's Revise button and Revisions tab.

A saved product is locked at its current revision, shown in the header as Rev. A · Locked. Its engineering fields — Dimension, Size, Weight, Material, Fabrication Process, Drawing Number, Unit of Measure and HSN — cannot be edited directly. To change any of them you open a new revision, edit it and release it. The old revision stays on record.

The steps​

1. Open a draft revision​

Open the product and click Revise. The box explains that this opens a new draft revision (Rev. B) copying the current engineering fields. Enter:

FieldWhat to enter
Change ReasonWhy the product is changing
ECO NumberYour engineering change number, for example ECO-2026-0017. Keep it short

Opening a draft revision

Click Open Draft Revision. The header now shows both Rev. A · Locked and Rev. B — DRAFT.

2. Edit the draft​

Click Edit Draft Rev. B. Change the engineering fields, and the reason and ECO number if needed, then click Save Draft.

Editing the draft revision

Rev. A remains the released revision while the draft is being worked on.

3. Submit and release​

  1. Open the Revisions tab and click Submit for Approval.
  2. Click Release Rev. B. The box warns: Releasing freezes Rev. B's engineering fields and supersedes Rev. A. This cannot be undone.
  3. Choose Interchangeable with prior revision? and add Approval Comments.
  4. Click Release.

Releasing a revision

tip

Always answer the interchangeability question. It tells stores and production whether old-revision stock can be used in place of the new one.

Revision history​

The Revisions tab lists every revision with its status (DRAFT, RELEASED or SUPERSEDED), ECO number, change reason, interchangeability, and who released it and when.

Revision history